Other

The VoIP Lounge Replacement 25 Ft Long Handset Receiver Cord for Siemens Business Phone Flat Black w/Long Lead

Read our Exclusive The VoIP Lounge Replacement 25 Ft Long Handset Receiver Cord for Siemens Business Phone Flat Black w/Long Lead Informative Review by NenoTel.com
Brand : The VoIP Lounge




(click on the image to enlarge)


Click here for: More Information about The VoIP Lounge Replacement 25 Ft Long Handset Receiver Cord for Siemens Business Phone Flat Black w/Long Lead.

Brand New, The VoIP Lounge 25′ handset / receiver cord for Siemens Business Phones. Cord length is 25′ fully stretched and approximately 42″ coiled, with long lead. Cords & Lengths: As a telecom industry standard, the indicated lengths of handset cords are when they are fully stretched out, not when they are coiled in their packaging. Cords are rarely used at their full maximum stretched length, so it’s important to choose an appropriate length when buying. Available lengths for most cords are: 7 feet (11 inches coiled / unstretched) 9 feet (15 inches coiled / unstretched) 12 feet (22 inches coiled / unstretched) 25 feet (42 inches coiled / unstretched)

Some Key Feature of The VoIP Lounge Replacement 25 Ft Long Handset Receiver Cord for Siemens Business Phone Flat Black w/Long Lead :

  • 25′ fully stretched, 3.5′ coiled (See Full Description Below)
  • Black Color
  • Brand New – Individually Bagged
  • The VoIP Lounge Replacement 25 Ft Long Handset Receiver Cord for Siemens Business Phone Flat Black w/Long Lead is so exclusive. It is not only you that are going to be pleased with this quality and also you are going to satisfy with the average price in case you compare with the other similar product which is on the online shop. This product is made with the very best fabric that our staff did agree and authorize to create this best item for our buyer and you.

    Estimated Price : $8.99
    Above price was taken on 2019-02-12
    Open the link below (Buy NOW Button) to see on more sure price…
    So, need more informative suggestion or are you Ready to Buy?


    See More Details and Latest Price >>>